Analysis Factors Causing Delays in Construction Projects for Building Construction in the City of Bengkulu (A Conceptual Study Based on a Literature Review)

Authors

  • Hari Putra Pratama Universitas Ratu Samban Author
  • M.wisridani P Universitas Ratu Samban Author

Keywords:

Building Construction Projects, Causal Factors, Construction Delay, Kota Bengkulu, Literature Review.

Abstract

Construction project delays are common challenges in building development across Indonesian cities, including Kota Bengkulu, where infrastructure growth in education, government, and commercial sectors continues to increase. This study aims to conceptually identify potential factors causing delays in building construction projects in Kota Bengkulu based on literature findings from previous studies in various Indonesian cities and their relationship with local geographical, climatic, and seismic characteristics. A narrative literature review method was employed by analyzing national and international scientific publications related to construction project delay factors. The results classify delay factors into six aspects: planning and scheduling, project scope and documentation, organization/coordination/communication, resource availability, financial conditions, and external/environmental factors. The characteristics of Kota Bengkulu as a humid tropical region with high rainfall intensity throughout most of the year and an active seismic zone due to tectonic plate interaction along the Indian Ocean coast indicate potential risks, particularly related to environmental conditions and resource availability. This conceptual study provides an initial framework for understanding construction delay mechanisms in Kota Bengkulu; however, empirical research involving actual project data is required to validate the identified factors.

Downloads

Download data is not yet available.

References

Agustiawan, A., Dwiantoro, E., & Belladona, M. (2026). Studi Penerepan Earned Value Analysis (Eva) Terhadap Waktu Pada Proyek Konstruksi (Studi Kasus: Pembangunan Instalasi Pengolahan Air Penyediaan Air Minum (IPA PAM) Di Desa Lubuk Puar Bengkulu Tengah). Jurnal Teknik Sipil, 6(1), 32-45. https://journal.ilmudata.co.id/index.php/RIGGS/article/view/6312

Aldammak, M. M., Hamzah, N., & Khoiry, M. A. (2025). Causes For the Delay in Construction Offices Building: A Systematic Review. Jurnal Kejuruteraan, 37(5), 2453-2467. https://doi.org/10.17576/jkukm-2025-37(5)-33

Anwar, M., Kurniyaningrum, E., Pontan, D., & Innavona, I. (2024). Evaluation Of Cost And Time Performance Control Using The Concept Method Of Earned Value In The Purwodadi Market Development Project, Argamakmur District, North Bengkulu Regency. Eduvest-Journal of Universal Studies, 4(11), 10878-10898. https://doi.org/10.59188/eduvest.v4i11.49920

Bunga, H., Utomo, G., & Pratiwi, R. (2026). Analisis Keterlambatan pada Proyek Peningkatan Gedung Kantor DPU Kota Balikpapan Menggunakan Lean Six Sigma Framework. Jurnal Talenta Sipil, 9(1), 899-912. http://dx.doi.org/10.33087/talentasipil.v9i1.1134

Dadiara, Z., Serang, R., & Titaley, H. D. (2024). Analisis Faktor Penyebab Keterlambatan Pembangunan Hall Keberangkatan Dan Kedatangan Bandara Pattimura Ambon. Jurnal Penelitian Multidisiplin Bangsa, 1(5), 317-326. https://doi.org/10.59837/jpnmb.v1i5.67

Fadlullah , A., Kurniawan, D., & Gusmulyani. (2025). Analisis Faktor Penyebab Keterlambatan Proyek Rehabilitasi Gedung Labor Kesehatan Kota Bukittinggi. Rangkiang Jurnal , 1(2), 192–199. https://rangkiangjurnal.com/index.php/rangkiang/article/view/84

Hartanti, L. B. (2025). Development of Work Breakdown Structure (WBS) and Standard Operating Procedure (SOP) for Architectural Work Components of High-Rise Buildings with Risk-Based Design-Build Contracts to Improve Project Time Performance. Journal Transnational Universal Studies, 3(5). https://doi.org/10.58631/jtus.v3i5.163

Huwae, M., Serang, R., & Langi, J. P. (2024). Analisis Faktor-Faktor Keterlambatan Proyek Pada Pembangunan Gedung Sekolah Madrasah Tsanawiyah Negeri 6 Maluku Tengah. Jurnal Penelitian Multidisiplin Bangsa, 1(6), 428-440. https://doi.org/10.59837/jpnmb.v1i6.81

Ilham, M. H., & Khiyana, A. I. (2026). Faktor Dominan Penyebab Keterlambatan Waktu Pada Proyek Konstruksi Gedung: Studi Litelatur Sistematis. CIVILTECH: Journal of Civil and Technology Research, 1(1), 1-11. https://journal.synersa.org/index.php/civiltech/article/view/42

Jamal, J., & Ian, M. R. (2025). Analisis faktor penyebab keterlambatan proyek konstruksi di Indonesia. Jurnal Kajian Teknik Sipil, 10(1), 1-8. https://doi.org/10.52447/jkts.v10i1.8071

Lestari, I. G. A. A. I., Pradnyadari, N. L. M. A. M., & Dewi, N. P. I. C. (2022). Analisis Faktor-Faktor Penyebab Keterlambatan Pelaksanaan Proyek Konstruksi di Kabupaten Badung:(Studi Kasus: Proyek Konstruksi Gedung pada Seksi Tata Bangunan Bidang Cipta Karya Dinas PUPR Kabupaten Badung). Widya Teknik, 17(01), 19-26. https://doi.org/10.32795/widyateknik.v17i01.2968

Pemerintah Kota Bengkulu. (n.d.). Profil Geografis Kota Bengkulu. Diakses dari https://profil.bengkulukota.go.id/geografis/

Putra, D. A., Sari, O. L., & Situmorang, R. (2023). Analisis faktor keterlambatan proyek konstruksi di Kota Balikpapan. Jurnal Teknik Sipil: Rancang Bangun, 9(1), 17–24. https://doi.org/10.33506/rb.v9i1.2044

Rauzana, A., & Dharma, W. (2022). Causes of delays in construction projects in the Province of Aceh, Indonesia. PloS one, 17(1), e0263337. https://doi.org/10.1371/journal.pone.0263337

Rizal, A. H., Fay, S., & Krisnayanti, D. S. (2024). Pengaruh biaya terhadap penyebab keterlambatan penyelesaian proyek konstruksi bendungan. Jurnal Teknik Sipil, 13(1), 55–66. https://sipil.ejournal.web.id/index.php/jts/article/view/851

Rizal, A., Hilmansyah, T., Hasanah, Y., Setiawan, H., Sutrisno, M., & Rodiah, F. (2025). Factors Causing Cost Overrun in Construction Projects in Central Sulawesi. International Journal of Health, Economics, and Social Sciences (IJHESS), 7(4), 1711-1715. https://doi.org/10.56338/ijhess.v7i4.8791

Sanni-Anibire, M. O., Mohamad Zin, R., & Olatunji, S. O. (2022). Causes of delay in the global construction industry: a meta analytical review. International Journal of Construction Management, 22(8), 1395-1407. https://doi.org/10.1080/15623599.2020.1716132

Soeharto, I. (1997). Manajemen Proyek Dari Konseptual Sampai Operasional. Erlangga.

Soviana, W., Herlina, E., Soviati, S., & Musrian, A. (2022). Identifikasi Faktor–Faktor Penyebab Cost Overrun dan Time Overrun pada Proyek Konstruksi Gedung Di Kota Banda Aceh. Tameh, 11(1), 11-20. https://doi.org/10.37598/tameh.v11i1.156

Trianshy, M., Edriani, A. F., & Bahri, S. (2022). Analisis Faktor Cost Overrun Dan Time Overrun Pada Proyek Konstruksi Di Kota Bengkulu. Jurnal Multidisiplin Dehasen (MUDE), 1(2), 27-36. https://doi.org/10.37676/mude.v1i2.2063

Widiasanti, I., & Lenggogeni. (2013). Manajemen Konstruksi. PT Remaja Rosdakarya.

Yunita, A., & Yusri, N. (2026). Analisis Faktor Keterlambatan Proyek Pembangunan Gedung UIN Mahmud Yunus Batusangkar. Jurnal Teknik Sipil Institut Teknologi Padang, 13(1), 104-112. https://doi.org/10.21063/jts.2026.V1301.0104-112

Downloads

Published

2026-06-17

How to Cite

Analysis Factors Causing Delays in Construction Projects for Building Construction in the City of Bengkulu (A Conceptual Study Based on a Literature Review). (2026). Technema: Journal of Intelligent Engineering and Computing, 1(2), 113-124. https://sovereignresearch.org/technema/article/view/186